{"id":1558,"date":"2026-10-08T10:47:46","date_gmt":"2026-10-08T10:47:46","guid":{"rendered":"https:\/\/paintlogs.com\/blog\/?p=1558"},"modified":"2026-10-08T10:47:48","modified_gmt":"2026-10-08T10:47:48","slug":"painting-during-refurbishment-managing-coshh-risks","status":"publish","type":"post","link":"https:\/\/paintlogs.com\/blog\/painting-during-refurbishment-managing-coshh-risks\/","title":{"rendered":"Painting During Refurbishment: Managing COSHH Risks Without Compromising Fire-Stopping Measures"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Painting is often scheduled late in a refurbishment project, when walls are closed, services have been installed and attention has shifted towards finishes. That timing can make the work look straightforward. In practice, decorators may be working around chemical products, recently altered service penetrations and areas of compartmentation that have already been inspected or are about to be concealed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The combination matters in 2026 because building fire-safety guidance is still changing. Approved Document B was updated in September, while the Building Safety Regulator continues its wider review of fire-safety guidance for existing buildings. For refurbishment teams, this adds weight to a basic project-management principle: finishing work should not obscure unresolved safety defects.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>COSHH Starts With The Product&nbsp;<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Paints and coatings vary widely. Some water-based products present relatively low inhalation risk when used normally, while other coatings, solvents, hardeners and spray products need tighter controls. HSE specifically identifies isocyanates in polyurethane paints, coatings, foams, glues and flooring products. Spraying can produce very high exposure because fine droplets are easily inhaled.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Control of Substances Hazardous to Health Regulations require employers to assess exposure and control it adequately. <a href=\"https:\/\/humanfocus.co.uk\/e-learning\/coshh-training\/\" target=\"_blank\" rel=\"noopener\">Online COSHH training<\/a> can help workers and supervisors understand how to assess hazardous substances, what information to check and why the method of application affects the controls required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A safety data sheet is useful, but it is not a completed COSHH assessment. The assessment still needs to consider how much product is used, whether it is sprayed, brushed or rolled, how long the task lasts, ventilation, who else may be exposed and whether the work takes place in a confined or occupied area. Substitution, local exhaust ventilation and changes to the method may control exposure more effectively than relying on personal protective equipment alone.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Preparation Is As Important As Application<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/paintlogs.com\/blog\/tips-for-a-successful-roof-painting-project\/\">Surface preparation<\/a> may create a different set of hazards. Sanding, scraping and mechanical removal can generate dust and disturb older coatings. Contractors should understand what they are removing before work starts, particularly in older buildings where previous materials may not be well documented. Wet methods, extraction and suitable respiratory protection may be needed depending on the substance and task.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Refurbishment also creates coordination problems. One contractor may be preparing surfaces while another installs services or completes fire-stopping work nearby. Dust extraction, ventilation and access arrangements should therefore be planned across the area rather than by each trade in isolation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Respiratory protective equipment, when required, also needs more thought than simply issuing a mask. The equipment has to be suitable for the contaminant and work method, compatible with other protective equipment and, for tight-fitting facepieces, supported by appropriate face-fit arrangements. Filters and cartridges have limitations and replacement requirements. These details are easy to miss when a decorating package is treated as low risk because the work is familiar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Occupied refurbishments add another complication. Offices, retail spaces, schools and residential buildings may remain partly in use while painting during refurbishments continues elsewhere. The assessment should consider people who are not carrying out the work but could still be affected by vapours, aerosols or dust. Segregation, timing and ventilation can be more useful than trying to manage exposure after contaminants have spread into neighbouring areas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Decoration Can Hide Evidence&nbsp;<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fire stopping is intended to maintain the fire resistance of walls, floors and other elements where services pass through them. On a busy refurbishment, penetrations can be created late in the programme for cables, pipes or ventilation. If these openings are not treated correctly, the intended compartmentation may be weakened.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Decorative finishes can then make the defect harder to find. A boxed-in riser, newly painted wall or completed ceiling may conceal gaps that would have been obvious a few days earlier. This is why inspection sequencing matters. Areas that require verification should be checked before they are covered or visually blended into the finished space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">People responsible for checking this work need suitable knowledge of passive fire protection, installation details and common defects. A <a href=\"https:\/\/humanfocus.co.uk\/e-learning\/fire-stopping-training\/\" target=\"_blank\" rel=\"noopener\">fire stopping inspection course<\/a> can support the underlying awareness needed to recognise why penetrations, joints and interfaces require attention, although competence should always match the complexity of the inspection being carried out.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2026 Fire-Safety Changes Make Record Keeping More Valuable<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The current review of Approved Document B includes proposals to consolidate guidance for building work on existing buildings. Separate 2026 amendments also took effect on 30 September in relation to second stair provisions for certain taller residential buildings. These changes are not a new rule about paint or fire stopping, but they show how actively the fire-safety requirements around buildings are being reviewed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For refurbishment teams, good records make future decisions easier. Photographs of completed fire-stopping work, product details, inspection results and marked-up drawings can preserve information that disappears once finishes are applied. If a later contractor needs to open a wall or add another service, those records provide a starting point for understanding what is already there.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Arrange the Work to Prevent One Control from Undermining Another<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">COSHH controls and fire-safety controls can interact in practical ways. Temporary extraction equipment may need ducting through or around fire-resisting elements. Protective sheeting may cover labels or inspection points. Access equipment can make it tempting to use existing openings for cables or temporary services. These details are manageable when responsibilities are clear before work begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contractors should know which areas are sensitive, what penetrations are permitted, who authorises changes and who signs off reinstatement. Decorators also need to know when to report a damaged seal, open penetration or missing fire-stopping detail instead of <a href=\"https:\/\/paintlogs.com\/blog\/painting-and-home-remodeling\/\">painting over it<\/a>. That does not turn painters into fire-stopping specialists. It gives them enough awareness to avoid concealing an obvious problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Storage and disposal also deserve attention on a live site. Solvent-containing products, contaminated wipes and partly used containers should be managed in line with the product information and site arrangements. Poor housekeeping can increase fire load, create avoidable exposure and obstruct access routes. A refurbishment programme that coordinates deliveries, storage, waste removal and end-of-shift checks is easier to control than one where each trade manages materials independently.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Good Refurbishment Finishes With Solid Evidence of Quality Work<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A high-quality finish should not come at the expense of worker health or building safety. COSHH assessment should reflect the products and methods actually used, while passive fire protection should be checked before decorating makes important details difficult to inspect. Where several trades share the same area, the programme should also leave enough time for defects to be corrected before final finishes begin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The strongest refurbishment programmes coordinate these requirements through sequencing, supervision and clear handover information. Painters can then work with suitable exposure controls, fire-stopping inspections can take place at the right stage, and the finished building retains a record of what was installed behind the surface. That is a more useful definition of completion than a wall that simply looks finished.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Painting is often scheduled late in a refurbishment project, when walls are closed, services have been installed and attention has shifted towards finishes. That timing can make the work look straightforward. In practice, decorators may be working around chemical products, recently altered service penetrations and areas of compartmentation that have already been inspected or are&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1559,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1558","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-renovation"],"taxonomy_info":{"category":[{"value":1,"label":"Construction &amp; Renovation"}]},"featured_image_src_large":["https:\/\/paintlogs.com\/blog\/wp-content\/uploads\/2026\/10\/Painting-During-Refurbishment-Managing-COSHH-Risks-1024x576.jpg",1024,576,true],"author_info":{"display_name":"Admin","author_link":"https:\/\/paintlogs.com\/blog\/author\/admin\/"},"comment_info":0,"category_info":[{"term_id":1,"name":"Construction &amp; Renovation","slug":"construction-renovation","term_group":0,"term_taxonomy_id":1,"taxonomy":"category","description":"","parent":0,"count":228,"filter":"raw","cat_ID":1,"category_count":228,"category_description":"","cat_name":"Construction &amp; Renovation","category_nicename":"construction-renovation","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/posts\/1558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/comments?post=1558"}],"version-history":[{"count":0,"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/posts\/1558\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/media\/1559"}],"wp:attachment":[{"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/media?parent=1558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/categories?post=1558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paintlogs.com\/blog\/wp-json\/wp\/v2\/tags?post=1558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}